Skip to main content
Innovative Well Abandonment logo+InPlay Oil Corp. logo
Project AreaApproachRatesAssumptionsContacts

SURFACE CUT & CAP PROPOSAL

CUT & CAP INPLAY OIL CORP. 100/06-13-050-06W5

Prepared for InPlay Oil Corp. A field-ready plan for one surface cut and cap using Innovative Well Abandonment's Abrasive Mixing Unit (AMU) ultra-high-pressure cutting system.

01

Wellbore

Surface abandonment scope

01

Licence

Included in this program

01

Project Day

Including mob / demob

View Rate ScheduleContacts

Compliant

SafetySync
COR Workplace Safety
ISNetworld Member Contractor
ComplyWorks
Avetta
WorkSafeBC
WorkHub
8AM

01 — Project Area

Single-Well Footprint

One InPlay Oil Corp. gravel-pit well with the supplied conductor barrel and cut specifications.

Gravel Pit Well

100/06-13-050-06W5

CUT & CAP

Final pit level will be 7.5 m lower than current ground level. The well has a 30" conductor barrel. The cut will be made in 2 m increments, 10 m from surface.

02 — Approach

Our Method

IWA ABRASIVE MIXING UNIT (AMU) Ultra High Pressure Cutting Package.

ConsiderationInnovative Well Abandonment
Cutting methodUltra-high-pressure cutting unit, packable to the wellbore
Advantage & BenefitsAbility to cut at depths down to 10m+
Cut Zones10m cut, 8m cut, 6m cut, 4m cut

Cutting method

Our approach

Ultra-high-pressure cutting unit, packable to the wellbore

Advantage & Benefits

Our approach

Ability to cut at depths down to 10m+

Cut Zones

Our approach

10m cut, 8m cut, 6m cut, 4m cut

03 — Rates

Equipment & Rate Schedule

Itemized project estimate showing the supplied units, quantities, rates and extended totals.

Primary Equipment

UHP CUTTING TRUCK & ALL CONSUMABLES

$11,000.00

$2,750.00 / Well × 4 at (10m, 8m, 6m, 4m)

Logistics & Mobilization

  • Cut Truck Crew & Travel

    Hourly × 3 at $375.00

    $1,125.00

  • 16' Dump Trailer

    Daily × 1 at $500.00

    $500.00

  • Support Truck Mobilization/Demobilization

    KM × 190 at $1.75

    $332.50

  • Subsistence

    Day × 3 at $250.00

    $750.00

Estimated Project Total

Based on the units and quantities listed above.

$13,707.50

04 — Assumptions

Assumptions & Conditions

The basis of estimate for this proposal, including access, schedule and operating conditions.

Rates & Surcharges

No fuel surcharge apply. Standard daylight operating hours apply. There will be no overtime.

Estimate Basis

The project estimate is based on the units, quantities and rates listed in the supplied schedule, including mobilization and demobilization. Anything outside of IWA's control will be billed at the standby rate listed in rate schedule. 

REGULATORY

D20-compliant as per AER regulations along with digital records with attached visual evidence.

05 — Contacts

Contacts & Next Steps

Leads on both sides of the project, and what has to close before the crew mobilizes.

Client

InPlay Oil Corp. logo

InPlay Oil Corp.

Address

2000 – 350 7th Avenue SWCalgary, Alberta T2P 3N9
AT

Adam Toma

Completions/Well Service Superintendent | InPlay Oil Corp.

(780) 499-0589adamt@inplayoil.com

Contractor

Innovative Well Abandonment logo

Innovative Well Abandonment

Address

11630 Kingsway NW,Edmonton, Albert T5G 0X5
Scott Bowes portrait

Scott Bowes

President — Primary Contact

780-808-1349sbowes@innovativewa.com
Chris Hamilton portrait

Chris Hamilton

Business Development Manager

403-630-1243chamilton@innovativewa.com
Next Step

Confirm access, approve estimate, mobilize

01

Assessment

02

Approval

03

Mobilize

Made with